"Quality & Service"

970-535-4317

Prepare your site prior to the arrival of the sod. Remember to do the following:

●  Remove weeds and debris.

●  Establish a rough grade and eliminate low spots.

●  Apply four to six yards of compost per 1,000 sq ft. (not top soil) to bare ground.

●  Level and rake the installation site until it is smooth.

●  Grade areas along sidewalks and driveways approximately 3/4 inches below top of concrete.


Be sure you have water hoses and sprinklers on site for initial watering.

●  Make sure sprinkler system is performing properly.

●  Understand the operation of your sprinkler clock for proper watering of the new sod  and established lawn.

●  We can provide a rain gauge at no cost so that you can determine how much water you are applying.